NOTICE: Removal of gas pipes on 6th floor of the Administration Bureau Bldg. 2 on 22nd December
Constructions for removal of gas pipes take place as follows on the 6th floor of the Administration Bureau Bldg. 2. Please note that there will be construction noise and smell of gas during that time.
Date: 1pm-5pm, Friday, 22nd December
Place: Study Halls (#620, #626, #630), PC room(#611), Student Lounge(#633), Locker room(#631) on the 6th floor of the Administration Bureau Building 2
* Gasfitters may enter each room for the constructions during the time above.